Lead Times for DALON Filter Tubes
1. Standard (In-Stock) Products
- Products: Common sizes/materials (e.g., 316L, 25×30×47mm, 15µm).
- Lead Time:
- 1–3 business days (ready to ship if in stock).
- Note: Stock status can be confirmed via real-time inventory checks.
2. Customized Orders
- Modified Standards (e.g., changing pore size or length of a stock item):
- Lead Time: 2–3 weeks (includes sintering, testing, and QA).
- Fully Custom Designs (new dimensions/material/porosity):
- Prototyping: 3–4 weeks (design validation + sample production).
- Bulk Production: 4–6 weeks (for orders >50 units).
3. Expedited Options
- Rush Sintering: +20% fee (reduces custom order time by 10–30%).
- Emergency Stock: Ask about “near-match” standard filters for faster fulfillment.
Factors Affecting Lead Times
Factor | Impact |
---|---|
Material Rarity | Special material type may add 1–2 weeks. |
Certifications | ISO/QC docs add 3–5 days. |
Testing Requirements | Bubble point/flow tests add 3 days. |
Order Volume | Bulk (>500 units) may reduce time. |
How to Ensure Faster Delivery
- Choose Standard Designs (e.g., 316L, 15–50µm).
- Opt for 304 Stainless Steel (faster than 316L for some sizes).
- Provide Clear Specs Upfront (avoid back-and-forth delays).
Customer Example
Scenario: A hydraulic OEM needs 100x 20µm 316L tubes (25×30×47mm) with NPT threads.
- Standard Lead Time: 3 weeks (modified stock item).
- Expedited: 10 days (+20% fee).