What are the lead times for standard vs. custom filter tube orders?

Lead Times for DALON Filter Tubes

1. Standard (In-Stock) Products

  • Products: Common sizes/materials (e.g., 316L, 25×30×47mm, 15µm).
  • Lead Time:
    • 1–3 business days (ready to ship if in stock).
    • Note: Stock status can be confirmed via real-time inventory checks.

2. Customized Orders

  • Modified Standards (e.g., changing pore size or length of a stock item):
    • Lead Time: 2–3 weeks (includes sintering, testing, and QA).
  • Fully Custom Designs (new dimensions/material/porosity):
    • Prototyping: 3–4 weeks (design validation + sample production).
    • Bulk Production: 4–6 weeks (for orders >50 units).

3. Expedited Options

  • Rush Sintering: +20% fee (reduces custom order time by 10–30%).
  • Emergency Stock: Ask about “near-match” standard filters for faster fulfillment.

Factors Affecting Lead Times

FactorImpact
Material RaritySpecial material type may add 1–2 weeks.
CertificationsISO/QC docs add 3–5 days.
Testing RequirementsBubble point/flow tests add 3 days.
Order VolumeBulk (>500 units) may reduce time.

How to Ensure Faster Delivery

  1. Choose Standard Designs (e.g., 316L, 15–50µm).
  2. Opt for 304 Stainless Steel (faster than 316L for some sizes).
  3. Provide Clear Specs Upfront (avoid back-and-forth delays).

Customer Example

Scenario: A hydraulic OEM needs 100x 20µm 316L tubes (25×30×47mm) with NPT threads.

  • Standard Lead Time: 3 weeks (modified stock item).
  • Expedited: 10 days (+20% fee).